INSTALLATION

After completing the preliminary preparations such as confirmation before paving, preparation work, and basic quality requirements, the next step is the paving of synthetic rubber coils.

INSTALLATION-background
Draw basic line of the field

① Draw basic line of the field

Place the required rubber roll

② Place the required rubber roll

Stir the glue within 1 hour

③ Stir the glue within 1 hour

Pave the glue

④ Pave the glue

Lay the rubber rolls

⑤ Lay the rubber rolls

Evening with the roller, let the air out and glue be firmed.

⑥ Evening with the roller, let the air out and glue be firmed.

Fixed by air gun nails (will be removed after the glue get firmed.)

⑦ Fixed by air gun nails (will be removed after the glue get firmed.)

Bricks should be put on the side of two rolls to weight.

⑧ Bricks should be put on the side of two rolls to weight.

The installation of curved track is similar with straight track, but requires more glue and weight.

⑨ The installation of curved track is similar with straight track, but requires more glue and weight.

Clean the field, and check the whole court.

⑩ Clean the field, and check the whole court.

Line marking

⑪ Line marking

Finished

⑫ Finished

ARE YOU LOOKING FOR HIGH PERFORMANCE SPORTS FLOORING?

EXPLORE OUR RANGE OF SPORTS SURFACES FOR ANY TYPE OF FACILITY.

TALK US ABOUT YOUR SPORT FACILITY.

Scroll to Top

TALK US ABOUT YOUR SPORT FACILITY.