Labuan Running Track Achieves World Athletics Class 2 Certification
HOME » BLOGS » STADIUM PROJECT » Labuan Running Track Achieves World Athletics Class 2 Certification

Labuan Running Track Achieves World Athletics Class 2 Certification

Views: 0     Author: HUADONG     Publish Time: 2026-10-21      Origin: HUADONG Sports

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The athletics facility at Kompleks Sukan Labuan in Malaysia has received World Athletics Class 2 certification. Featuring HUADONGTRACK prefabricated rubber running track surfacing, the project brings together on-site installation, seam finishing, track marking and facility measurement. Certificate S-12-0146 was issued on 7 October 2026 and lists an expiry date of August 2031.

Aerial view of the running track at Kompleks Sukan Labuan after lane marking.

Aerial view of the running track at Kompleks Sukan Labuan after lane marking.

A Prefabricated Rubber Running Track Project in Malaysia

Located in the Federal Territory of Labuan, the facility uses HUADONGTRACK synthetic surfacing manufactured by Huadong Holding Group Wenzhou Sports Equipment Co., Ltd. Project photographs document the red track rolls during installation and the marked track surrounding the grass infield.

For owners and contractors planning an athletics track, the project illustrates how material selection, installation and certification documentation fit together. A successful delivery plan needs to address the condition of the base, the surfacing system, site coordination and the requirements of the intended facility certification.

From Factory Made Rolls to On Site Installation

Prefabricated rubber running track surfacing arrives as manufactured rolls that are positioned, cut and bonded on site. Factory production establishes the material format, while the finished installation also depends on the prepared base, adhesive system and working conditions.

Prefabricated track rolls laid out along the stadium track during installation.

Prefabricated track rolls laid out along the stadium track during installation.

Coordinating Base Preparation and Laying

The Labuan site photographs show rolls being positioned and surfacing laid over an adhesive-coated area. For similar projects, checks for base condition, cleanliness, moisture and drainage should be agreed before laying begins. Installation should follow the requirements of the specified surfacing and adhesive system, with site conditions reassessed when weather changes.

The installation team working at an adhesive-coated section of the track base.

The installation team working at an adhesive-coated section of the track base.

Seam Finishing and Track Marking

Roll edges need careful attention along straights, curves and perimeter details. The close-up installation photograph shows an operative trimming the edge of the prefabricated surface. Cutting accuracy, seam alignment and edge bonding are important inspection points throughout this stage of the work.

Close-up of edge trimming during prefabricated rubber track installation.

Close-up of edge trimming during prefabricated rubber track installation.

Connecting the Surface to the Track Layout

Track marking follows the facility design and applicable measurement requirements. The project certificate records marking work from 26 to 30 August 2026 and a survey dated 30 August 2026. The aerial photographs show the lane markings, while the measurement documentation provides the technical basis for assessing the facility layout.

Planning an Overseas Running Track Project

Before procuring a track system, owners should establish the intended use, site dimensions, existing base condition and target certification category. The scope should also define material supply, transport, storage, installation responsibilities and handover documents. These details help suppliers and contractors prepare comparable proposals and a realistic delivery schedule.

After handover, cleaning and inspection should follow the surfacing manufacturer’s maintenance instructions. Keeping installation, survey and maintenance records supports future inspections and repair planning.

World Athletics Class 2 Facility Certification

The certificate identifies KOMPLEKS SUKAN LABUAN, WP LABUAN, Malaysia, and names HUADONGTRACK as the synthetic surface product. Its certification number is S-12-0146, with an issue date of 7 October 2026 and an expiry date of August 2031.

World Athletics Class 2 certificate for Kompleks Sukan Labuan.

World Athletics Class 2 certificate for Kompleks Sukan Labuan.

Under the World Athletics certification procedures, Class 2 certification requires a synthetic surface with a valid Product Certificate and a facility that meets the relevant accurate-measurement requirements. It should not be confused with the full in-situ surface testing required for Class 1 certification. Eligibility for a particular competition also depends on that event’s rules and facility requirements.

Frequently Asked Questions

1. What is a prefabricated rubber running track?

It is a running track surface supplied in factory-made rubber rolls and installed on a prepared base. The rolls are positioned, trimmed and bonded to form the track surface. The specified material system and installation requirements should be considered together when planning a project.

2. Which running track surface was used at Labuan?

The certificate for Kompleks Sukan Labuan identifies HUADONGTRACK as the synthetic surface product and Huadong Holding Group Wenzhou Sports Equipment Co., Ltd. as its manufacturer.

3. Does a certified product automatically certify the facility?

No. Product certification and facility certification apply to different subjects. Using a certified surface does not automatically certify the completed athletics facility. The project must also satisfy the documentation and assessment requirements for its intended certification category.

4. How should track thickness and project cost be determined?

Thickness should follow the selected system, design and applicable project requirements. Cost depends on the scope, including base preparation, surfacing area, transport, installation, marking and certification-related services. A quotation should identify these items clearly so that proposals can be compared on the same basis.

5. Does the certificate expiry date define the track’s lifespan?

No. A certification expiry date is not a service-life prediction or a warranty. Surface condition depends on use, maintenance and site conditions. Inspections and the manufacturer’s maintenance guidance should inform decisions about repairs or replacement.

6. What information is needed to plan a similar project?

Prepare a site plan, dimensions, photographs of the existing base, intended activities, target certification category and preferred construction period. This information helps the project team assess the surfacing options, installation scope and supporting documentation.

Planning Your Next Athletics Track

The Labuan project provides a practical reference for bringing prefabricated rubber running track installation and facility certification into one delivery plan. Begin with the intended use and certification requirements, then coordinate the material system, base preparation, installation and measurement work. Share your site information with the surfacing supplier and installation team to develop a project-specific proposal.

Keywords: Labuan running track; prefabricated rubber running track; World Athletics Class 2 certification; HUADONGTRACK; Malaysia athletics facility.

Table of Content list

THEY’VE TEAMED UP WITH US

QUICK LINKS

CONTACT US

Tel: +86-138-6872-5588
E-mail: clay.jin@huadongtrack.com
WhatsApp: +8613868725588
Add: Huadong Rubber Industrial Zone, Baishi Yueqing Zhejiang China, 325604
HongKong Business Contacts:
E-mail: hk@huadongtrack.com
Copyright © 2025 Huadongtrack All Rights Reserved.| Sitemap |Privacy Policy