INSTALLATION
HOME » SUPPORT » INSTALLATION

INSTALLATION

Inspect Base
1:Inspect Base 
Check hardness, drainage, and elevation compliance. Repair uneven areas.
Surface grinding & sealing
2:Surface grinding & sealing
Polish Base and apply uniform sealing coat for adhesion.
Level Correction
3:Level correction
Fill depressions with water-based compounds to ensure flatness.
Position verification
4:Position verification
Confirm site layout aligns with installation standards.
Pre-laying planning
5:Pre-lay planning
Mark daily work zones and pre-position roll materials.
Adhensive mixing
6:Adhesive mixing
Prepare glue according to ambient temperature/humidity.
Adhesive application
7:Adhesive application
Spread glue evenly with notched trowel along marked lines.
roll installation
8:Roll installation
Align rolls precisely; secure seams with nail guns + cement weights.
curve treatment
9:Curve treatment
Apply thickened forming adhesive and pressure blocks at bends.
seam trimming
10:Seam trimming
Cut overlapping edges, glue cross-sections, press to bond.
edge adjustment
11:Edge adjustment
Trim irregular edges using steel/wood templates.
instant QC
12:Instant QC
Check glue coverage, adjust thickness, fix defects (e.g., leaks).
site cleanup
13:Site cleanup
Remove excess glue, nails, and debris; cure surface.
line marking
14:Line marking
Verify and draw origin lines per specifications.
document handover
15:Document handover
Provide maintenance manual to owner post-completion.

VIDEO

THEY’VE TEAMED UP WITH US

QUICK LINKS

CONTACT US

Tel: +86-138-6872-5588
E-mail: clay.jin@huadongtrack.com
WhatsApp: +8613868725588
Add: Huadong Rubber Industrial Zone, Baishi Yueqing Zhejiang China, 325604
Copyright © 2025 Huadongtrack All Rights Reserved.| Sitemap |Privacy Policy