Which Areas of a Prefabricated Athletics Track Need a Thicker Surface?
HOME » BLOGS » Which Areas of a Prefabricated Athletics Track Need a Thicker Surface?

Which Areas of a Prefabricated Athletics Track Need a Thicker Surface?

Views: 0     Author: Site Editor     Publish Time: 2026-11-23      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

Extra thickness belongs where repeated, concentrated load lands in the same small footprint — sprint starts, relay change-over zones, the bends and jump approaches — and each needs a start limit, a stop limit and a joint detail back to the standard surface. The roll format, the base flatness and the joint decide whether a thickened zone behaves as designed.

Outdoor prefabricated rubber athletics track with marked lanes and a sprint start area on the straight

Which parts of a prefabricated athletics track usually need a thicker surface?

A separate, thicker build-up is usually drawn where force lands in the same footprint again and again: sprint starts and the first metres of acceleration, relay change-over zones, the bends, and the approach and take-off areas of the jumps. Published supplier guidance names those high-impact areas and ties thickness to base flatness, drainage, installation quality and climate exposure.

Landing surrounds, aprons and maintenance routes stay in the schedule as separate line items: what crosses them differs from what crosses a lane, so agree their limits and build-up with the venue operator.

Zone screen for a locally thickened surface
Zone or area Loading that justifies a separate thickness What the drawing has to close
Sprint starts and the acceleration metres after them Repeated block contact and drive forces in the same footprints; sprint starts are named as a high-impact area. Start and stop limits, a build-up stated by layer, and one transition joint to the standard surface.
Relay change-over zones Repeated outgoing and incoming foot contact inside a short marked length, named as a high-impact area. The zone length measured on the running line, with the same build-up and joint detail as the start zone.
Bends, including blocks set in the curve Combined vertical and lateral load during curve running and starting; curves are named among the high-impact areas. Limits that follow the curve geometry, plus the curve laying treatment in the installation sequence.
Jump approaches and take-off areas Concentrated take-off force at the board and repeated approach strides; jumping approaches are named in the same guidance. The approach limit, the board zone, and the joint where the approach meets the lane or the infield.
Landing surrounds, aprons and maintenance routes Mixed and site-specific: landing implements, trolleys, service vehicles and spectator movement. A decision on whether the area takes the standard build-up or a heavier one, with its own limit and joint.
Base and drainage beneath every zone The installation sequence inspects, grinds and seals the base and fills depressions for flatness before any roll is laid. Base tolerance and drainage for each zone, and a note that thickness does not correct an uneven base.

Why are sprint starts, exchange zones and bends treated differently?

They are watched separately because one small area takes load repeatedly, and a surface too thin for its duty level may wear quickly there. The supplier's guidance names those areas as high-impact and sets out 9 mm, 13 mm and 15 mm-or-thicker tiers for light, school and high-use stadium duty.

Do runways, landing surrounds and aprons belong in the same thickness schedule?

Yes, keep them in one schedule, but not as one line item. Runways and jump approaches behave like the lanes they join; landing surrounds, aprons and service routes carry different traffic and need their own limits and build-up decision.

Running-lane family: lanes, start and acceleration zones, exchange zones, bends, jump runways and approaches

Loading
Repeated foot and block contact in the same footprints; the guidance names sprint starts, relay exchange areas, curves and jumping approaches as high-impact areas.
Continuity with the lane
The area meets the lane surface directly, so the build-up and joint detail match the lane rather than changing at the boundary.
What the drawing has to close
A closed limit for each zone, one build-up stated by layer, and one transition joint detail reused for every zone.

Field-event and circulation areas: landing surrounds, aprons, equipment and maintenance routes

Loading
Mixed and site-specific: landing implements, trolleys, maintenance vehicles and spectator movement.
Continuity with the lane
These areas meet kerbs, pits, drainage covers and door thresholds, so the joint detail is usually longer than a lane-to-lane transition.
What the drawing has to close
A decision rather than a default: state whether the area takes the standard build-up or a heavier one, and agree the limit with the venue operator and the cost engineer.

Where does a thicker zone start and stop, and how is the joint detailed?

A thickened area is a closed shape, not a fade-out. Draw its start and stop limits on a straight, low-load line rather than mid-acceleration or mid-landing, give the zone its own build-up in section, and show one reusable transition detail back to the standard surface. Thickness cannot level an uneven base.

Plan and section schematic of a lane strip showing a standard build-up, a closed thickened zone with start and stop limits, a transition joint and the base beneath
  1. Worked example, step 1: mark the zone. Draw the thickened area on the plan with start and stop limits along the running direction, clear of the block positions unless the blocks sit inside the zone.
  2. Step 2: give the zone its own section. Show the standard build-up, the thickened build-up and the transition between them on one detail, with each build-up stated by layer rather than as a single number.
  3. Step 3: name the layer that changes. The published double-layer models put a 4 mm coloured surface layer over a 9 mm bottom layer inside a nominal 9–13 mm product, so say which layer changes in the thickened zone.
  4. Step 4: detail the transition joint. Seams are trimmed and edges adjusted with templates during installation, so the two depths should meet on a line that is drawn, not decided on site.
  5. Step 5: check the base before the surface. The sequence inspects, grinds and seals the base, fills depressions for flatness, and only then pre-lays and zones the rolls.
  6. Step 6: record the check for every zone. An instant quality-control step adjusts thickness and corrects defects, and the work ends with handover of a maintenance manual, so ask for that check to cover each thickened zone and its joint.

What does the roll format mean for a locally thicker build-up?

The GOTER prefabricated environmental rubber track is published in a fixed nominal format — 9–13 mm thick, 1.22 m wide and 15–20 m long — so local thickness cannot be ordered as one thick roll. It comes from the detailed build-up and transition, and from the base beneath.

The same nominal format is published for the GOMER and GODER models, both described as double-layer constructions with a 4 mm surface layer over a 9 mm bottom layer. If you are choosing a duty tier before you settle the zones, the supplier's guidance on how to choose the right running track thickness for schools and stadiums sets out the 9 mm, 13 mm and 15 mm-or-thicker tiers for light, school and high-use stadium duty, with the base, drainage, installation and climate factors that go with them.

Four ways to handle thickness where load concentrates
Approach How it is achieved Where it makes sense What changes on the drawing and in the order
One higher tier across the whole track Specify the higher duty tier everywhere instead of a separate zone build-up. Venues with heavy, spread-out use that want one surface condition throughout. A single build-up on every sheet, no transition joints, and more of the same roll format.
Standard surface with closed thickened zones Keep the standard product and detail a thicker build-up only inside the marked zones. Designs where load concentrates in a few footprints and the rest of the track carries normal use. Two build-ups in the zone schedule, one reusable joint detail, and a base check under every zone.
Curve laying treatment In the supplier's published installation method, the curve is brought down with thickened forming adhesive and pressure blocks. Curved sections, whatever thickness tier is chosen. Belongs in the method statement, not in the thickness schedule; it is not a surface-thickness increase.
Ordering one thick roll for a single zone Not a standard option: the published roll format is a nominal 9–13 mm band, 1.22 m wide and 15–20 m long. Not applicable. Zone thickness has to come from the detailed build-up and joint, and the supplier should confirm in writing what it will supply.

What should the drawing and the order package contain for thickened zones?

A complete thickened-zone package has four parts: a zone schedule with limits and build-ups by layer, a section detail showing the transition joint, a base and drainage requirement under every zone, and a facility-document reference with a handover check for each zone.

  • A zone schedule listing every thickened area with its start and stop limits and its build-up stated by layer.
  • A section detail showing the standard build-up, the thickened build-up and the transition joint between them.
  • The base requirement under each zone: inspected, ground and sealed, with depressions filled for flatness before the rolls are laid.
  • The joint method, referring to seam trimming and edge adjustment with templates during installation.
  • A reference to the facility documents for the competition level the venue is built to. The sport's international governing body publishes its facilities manual through its technical information document library, which lists the facilities manual editions 2019 and 2008, marking plans and the synthetic surface testing specification, and keeps its list of certified athletics facilities separate from its list of certified track surfacing products.
  • For a venue in the United Kingdom, the national governing body's TrackMark accreditation scheme assesses the track as one unit, including surface condition, and verifies the measurements needed to license higher-level competition, so a local thickness change is reviewed as part of the whole facility.
  • A written confirmation from the supplier of the build-up it will supply for each zone, and of the transition detail.
  • A handover check covering every thickened zone and its joint, using the installer's quality-control step and the maintenance manual issued at completion.

Walking the finished surface checks completed work; the installation crew carries out base preparation and laying under the project method statement.

Conclusion

Mark every area that takes repeated concentrated load as a closed zone with its own start limit, stop limit, build-up and joint, and keep the standard surface everywhere else.

Then check three things before the drawing goes out: the base under each zone is specified flat and drained rather than relied on for thickness, the roll format matches the thickness tier you have chosen, and every zone carries a written supplier confirmation and a handover check.

Frequently asked questions

Short answers to the questions that come up most often when a locally thickened zone is added to a prefabricated track drawing.

What does a thicker surface mean on a prefabricated athletics track?

It means a locally deeper build-up under a marked area, not a second surface laid on top. The published duty tiers describe overall use levels, and the same guidance notes that thickness is judged with base flatness, drainage, installation quality and climate exposure.

Do the bends need a thicker surface than the straights?

Curves are named among the high-impact areas, so a designer may thicken them, but no separate value for bends is published. In the supplier's published installation method, curves are brought down with thickened forming adhesive and pressure blocks, so confirm the curve treatment for the system you are specifying.

Can a thicker surface compensate for an uneven or poorly drained base?

No. The installation sequence inspects, grinds and seals the base and fills depressions for flatness before any roll is laid, and the thickness guidance treats base flatness and drainage as separate conditions, so an uneven base has to be corrected in the base package.

Can I order a thicker roll for one zone only?

No standard roll is published for a single zone. The prefabricated models come in a nominal 9–13 mm thickness band, 1.22 m wide and 15–20 m long, so local thickness comes from the detailed build-up and transition joint.

Which facility documents should the track drawing reference?

Name the facilities manual and the synthetic surface testing specification published by the sport's international governing body, and note that certified facilities and certified surfacing products sit on separate lists. Confirm which edition and which list apply to your venue.

How is a locally thickened zone checked and handed over?

The installation sequence includes a quality-control step that adjusts thickness and corrects defects, and handover includes a maintenance manual. Ask for that check to cover each thickened zone and its joint, with the record handed over.

Who should confirm the local build-up before the order is placed?

The design team sets the requirement, the supplier confirms in writing what it will supply and how the joint is made, and the cost engineer prices the two build-ups separately. Agree it before the order, not on site.

Is the surface layer thickness the same as the total track thickness?

No. The published double-layer models describe a 4 mm coloured surface layer over a 9 mm bottom layer inside a nominal 9–13 mm product, so say which layer changes when a zone is thickened.

Table of Content list

THEY’VE TEAMED UP WITH US

QUICK LINKS

CONTACT US

Tel: +86-138-6872-5588
E-mail: clay.jin@huadongtrack.com
WhatsApp: +8613868725588
Add: Huadong Rubber Industrial Zone, Baishi Yueqing Zhejiang China, 325604
HongKong Business Contacts:
E-mail: hk@huadongtrack.com
Copyright © 2025 Huadongtrack All Rights Reserved.|  Sitemap | Privacy Policy